Projects
Current Projects
- Dining Hall Basement Expansion
- Construction beginning Spring 2010
- 1000 sq/ft expansion to basement area
- Complete with 5 new Volunteer Rooms and walkout padio
- Excavation
- Foundation and Framing
- Concrete Floor, Insulation, Plumbing and Electrical
- Drywall, taping, painting, door and trim instalation, flooring
- Exterior grading and concrete padio
- Chapel Renovation
- Renovation beginning Fall/Winter 2009
- New Metal Roof with gable overhang and veranda
- New wall system on all four walls including new windows and doors
- New concrete floor
- Installation of Air Conditioning Unit
- New Stage and sound booth installed
- Program Areas and Landscaping
- Gravel trails and continue prep for new canoe shed
- Begin field reconditioning phase 1 along rock wall
- begin construction of dirt racing track adjacent to archery range
- Generla maintenance on program areas
Additional Projects for 2010
- Hill Cabins
- The addition of 2 cabins to the Hill
- Each cabin will accommodate 10 guests
- Each cabin will have a 3 piece washroom and heated mud room
- All three cabins will be complete with log siding and v-groove pine interior
- Each cabin will be equipped with new bunk beds and mattresses
Upcoming Projects
- Complete Fundraising and begin construction of Bear Lodge in Fall 2015
- Building will include a new chapel facility, 10 hotel style rooms with washroom facilities, 4 new Beaver Lodge style cabin rooms and multipurpose area
- This building will be a 2 storey facility facing the River with the Chapel and Hotel Rooms on the 2nd floor level entry to the rear and the 1st floor containing the Beaver Lodge Style layout with 4 cabin rooms and multipurpose area.
- Conference Center 2020
- A full Conference Center addition attached to the East side of the existing Dining Hall.
- This addition would contain hotel style rooms for up to an additional 60 people and would house amenities such as private conference rooms, dinning area, board room, mini gym with steam room, sauna and whirlpool.
- New Cooks Quarters, etc.
- Future Projects Site Map
Needs
- Maintenance
- Pallet Shelving
- Hand Tools
- Power Tools
- Large 2 stage Shop Compressor
- Garage Door Opener
- Large Walk-behind snowblower
- Safetied Dump Truck
- 4' Rotary sidewalk broom
- Shovels and Rakes
- Log Splitter
- Wood Chipper
- Skid Steer Loader
- Plasma Cutter
- Large Shop Tool Cabinet
- 5 Portable Infrared Furnaces
- Program
- Good Excercise Equipment
- New Canoe/Kayak building
- 4 16' Aluminum Canoes and Paddles
- Snowshoes
- Large Propane Barbecue
- Skateboards and Pads
- Street Hockey Equipment
- Pool noodles and water toys
- 5x10ft Enclosed Cargo Trailer
- Wakeboard and Water-ski equipment
- Basket, Soccer, and Volley balls
- 2 Golf Carts
- Dining Hall
- Stainless Steel Commercial 3 Tub Sink
- New Flourescent Lighting Fixtures, (call 345-2020 for complete details)
- commercial floor polishing machine
- Steam tables for buffet
- 10 x 8' plastic composite dining tables (call 345-2020 for complete details)
- 180 foldable dining chairs
- 4 Leather Couches for Lounge
- 20 Composite Adirondack Deck Chairs and 4 tables in brown or green
- white tablecloths
- linens for twin and double beds
- Other
- 20 soffit style white pot lights
- Green metal roofing assorted lengths call for details
- Gravel Grizzly separator
- Medium Sized Track Hoe
- 10,000 lineal ft of 6 inch V-Groove pine siding for inside buildings